VI. Corrosion Details
Adobe Reader is required to view these documents. Click here for free download.
- Ductile Iron Pipe Joint Bond C/1.0
- Ductile Iron Pipe Bonding of Fitting Joints C/1.1
- Ductile Iron Pipe Bonding of Fitting Joints C/1.1a
- Ductile Iron Mechanical Joint Valve Bonding C/1.2
- Bonding of Existing Pipe with Cathodic Protection When Connecting to New Metallic Water Mains C/1.2a
- Ductile Iron Pipe Bonding Around Valve Vault C/1.3
- Ductile Iron Pipe Bonding Around Manhole C/1.3a
- Mechanical Coupling Joint Bond C/1.4
- Fire Hydrant Bonding C/1.6
- Attachment of Bonding Wires for Crossing Water or Metallic Sewer Pipelines C/1.7
- Attachment of Bonding Wires for Parallel Water or Metallic Sewer Pipelines C/1.7a
- Pipeline Junction Box Detail (Typical) C/1.7b
- Separator to Avoid Metallic Contact on Crossing Pipes C/1.9
- Thermite Weld Wire Connection C/2.0
- Thermite Weld Detail C/2.1
- Sacrificial Anode Installation C/2.2
- Plan View of Sacrificial Anode Installation and Test Station Placement C/2.2a
- Typical Test Station Installation C/2.2b
- Splice Detail Anode Leader to the Header Cable C/2.3
- Hydrant Test Station (Type C) C/2.5
- Test Station at Mechanical / Push-on Cap / Plug C/2.6
- Insulated Flange Joint Detail C/3.0
- Coating of Insulating Flange Detail C/3.0a
- Insulating Flange Test Station (IJ) C/3.0b
- Insulating Flange Test Station with Anodes (IJ) C/3.0c
- Valve to Main Insulated Flange Joint (Restrained) C/3.1
- Valve to Main Insulated Flange Joint (Unrestrained) C/3.2
- PVC Insulating Spool for Branch Lines for 12” and Smaller C/3.2a
- Insulating Spool C/3.2b
- PCCP x DIP Tie-In Detail with Insulating Joint C/3.3
- PCCP x DIP Tie-In Detail with Insulating Joint and Test Lead Wires C/3.4
- Insulated Joint for Copper Pipe Service Connections (2” or less) C/3.5
- Insulated Tie Rods on Insulated Flange Joint C/3.6
- Flush-Mounted Test Station C/4.0
- Flush Mounted Test Station Terminal Block C/4.0a
- Flush Mounted Test Station Terminal Block for Bonded Pipelines C/4.0b
- Pipe Mounted Above Ground Test Station C/4.2
- Test Station with Reference Cell C/4.5
- IR Drop Test Station for Ductile Iron Pipe C/4.6
- Test Station at Foreign Pipeline Crossing C/4.7
- Field Applied Coatings When Connecting to Existing CIP and DIP Water Mains C/5.0
- Field Applied Coatings When Connecting to Existing PCCP Water Mains C/5.1
- 3” Thru 12” Ductile Iron Water House Connection Insulating Joint C/5.2
- Joint Coating Detail C/6.0
- PVC AWWA C-900 Pipe 4-inch, 6-inch, 8-inch or 10-inch Anode Protection Valve C/7.0
- PVC AWWA C-900 Pipe 12-inch Anode Protection Valve C/7.1
- PVC AWWA C-900 Pipe 4-inch to 12-inch Tapping Sleeve and Valve C/7.2
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Bends C/7.3
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Tee C/7.4
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Cross C/7.5
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Cap C/7.6
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for MJ Solid Sleeve C/7.7
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Water House Connections C/7.9
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Restrain Joint C/7.10
- PVC AWWA C-900 Pipe 4-inch to 12-inch Anode Protection for Service Saddle C/7.11
- PVC AWWA C-900 Pipe 4-inch to 12-inch Single Anode Placement C/7.12
- PVC AWWA C-900 Pipe 4-inch to 12-inch Multiple Anode Placement C/7.13
- PVC Main Multiple Anode Placement C/7.14
Last Modified: June 8, 2022, 10:04 am EDT