The design consists of an alignment study and design for the new force main/gravity sewer/pressure sewer from the Broad Creek (WWPS), to the Piscataway WWTP. In addition, new headworks and storage at the Piscataway WWTP and modifications to the Broad Creek WWPS are being designed to increase the overall capacity of the system. This project also includes community outreach and coordination with regulatory agencies for permitting.

The consultants selected to design this project are Hatch Mott MacDonald and Gannett Fleming, participating in a Joint Venture.

All required permits for the project have been approved.  This overall planning and design project has been broken down into the following four construction contracts:

  1. Piscataway Wastewater Treatment Plant Storage and Headworks Improvements – Contract No. CD4231D05 (substantially completed as of June 2016)
  2. Conveyance System (Southern Portion) – Contract No. CT4231E05 (Ongoing - substantial completion expected August 2017)
  3. Conveyance System (Northern Portion) – Contract No. CT4231F05 (Ongoing - substantial completion expected June 4, 2017) 
  4. Broad Creek WWPS Architectural/Electrical/Mechanical Rehabilitation – Contract No. CP4231G05 (Notice to Proceed expected January 2017 - Substantial completion - December 2019)
Aerial Map
Current and Proposed Views of Broad Creek Pumping Station