Regulatory Services Group

Plan Review

2009 WSSC Plumbing & Fuel Gas Code
Plan Review Staff
Plumbing and Gasfitting Plans
Site-Utility Plan Review (On-Sites)
Minor Site-Utility Plan Review (Waived On-Sites)
Sewer and Drain Cleaners  PDF DOCUMENT
Miscellaneous Forms and Documents
Contact Inspections and Plan Review Staff
Inspection Services Unit Contact Information  PDF DOCUMENT

Plan Review Staff
Staff Phone Number
Edward Iames (Supervisor) 301-206-8607
Waynne Wilson 301-206-8886
Ted Podles 301-206-8605
Carl Filippini 301-206-8604
Mike McDermott 301-206-8448
Mona Thomas 301-206-8525
   
   
Plan Review General Inquiries: 301-206-8886
  1-800-828-6439 ext 8886
   
   
Site Utility Construction Notification Line: 301-206-8598
(* Required prior to start of any Site Utility Project)
   
   
FAX: 301-206-8253

  Back to Top

Plumbing and Gasfitting Plans
Plumbing and Fuel Gas plans are required for all commercial construction. The code official shall have the authority to waive submittal requirements. Typically commercial work with 10 or less permit items, including gas appliances, may be waived.

Plans that will not be waived include :
  • Plans that require FOG (fats, oils, and grease abatement)
  • Fuel gas plans that have more than 3 appliances on the entire gas system and/or any of the gas appliances are over 200,000 Btu input.

      Submittal Requirements ( to Plumbing Plan Review office):
Two sets including floor plans to scale, schematics for fuel gas, waste and vent and water piping, riser diagrams, and where appropriate, details such as meter room layout, equipment schedules, backflow prevention device details, elevations and site plans, material and fixture specifications, fixture clearances etc. Submittals must also include a completed checklist  PDF DOCUMENT as well as a permit application  PDF DOCUMENT signed by a registered WSSC Master Plumber/ Gas Fitter. (For more information about the Permitting process, please click here).

  Back to Top

Site-Utility Plan Review
(On-Sites)
Design review is required for permit issuance and inspection administration for large site utility water and/or sewer systems. Where site water lines are 4" in diameter and larger and sewer lines that are 6" in diameter and larger, plans shall be submitted as a Site Utility Plan.

      Submittal Requirements (to Permit Services):
Six sets of plans must be submitted with a completed checklist  PDF DOCUMENT, a Hydraulic Information Sheet [HIS]  PDF DOCUMENT (where applicable), and payment for review fees.

  Back to Top

Minor Site-Utility Plan Review
(Waived On-Sites)
Design review is required for permit issuance and inspection administration is also required for less complex site-utility water and/or sewer systems. Where pipe diameters qualify per Site-Utility guidelines but where shorter runs are proposed, a Minor Site-Utility plan may be submitted.

      Submittal Requirements (to Permit Services) :
Six sets of plans must be submitted with a completed checklist  PDF DOCUMENT, a Hydraulic Information Sheet [HIS]  PDF DOCUMENT (where applicable), and a check for review fees.

  Back to Top

Sewer and Drain Cleaners
     Sewer Blockage Commitment Form  PDF DOCUMENT
  Back to Top

Miscellaneous Forms and Documents
Plumbing
Gasfitting
  Back to Top


WSSC Home  |  Contact Us  |   |  Privacy Policy  | 
 
14501 Sweitzer Lane, Laurel, Maryland 20707
Main: 301.206.WSSC (9772)       Toll Free: 1.800.828.6439
Emergency: 301.206.4002
E-mail: webmaster@wsscwater.com

 

WSSC homepage